Contents
The research that monitored the positioning of public charging infrastructure alongside battery electric vehicle ownership levels across 356 Norwegian municipalities spanning 2009 to 2019, concentrating on districts where the initial public charger was set up during that timeframe, revealed that within those predominantly rural zones the deployment of an inaugural public station triggered adoption, yielding an average boost in local ownership of 1.5 percentage points, which equals a 200% surge across five years. And the investigation that paired monthly new vehicle registrations by postal code in Germany from 2012 through 2017 with the official charging point registry discovered that a favorable long-term correlation exists albeit on a rather modest scale, and motorists do not inherently react to the sheer quantity of chargers but instead place greater value on charging speed.
The 30-second summary: the seven findings that matter
Each row names the study and the year. The thing to keep apart is the first charger from the hundredth.
| Finding | Result | Study and year |
|---|---|---|
| Electric ownership after the first charger | +200% over five years | Schulz and Rode, Energy Policy (2021) |
| Long-run relationship with charger numbers | Positive and weak | Illmann and Kluge, Transp Res Part D (2020) |
| What the consumer looks at | Kilowatts per point | Illmann and Kluge (2020) |
| Largest effect of a new charger | Where there were none | Van Dijk et al., Environ Resour Econ (2022) |
| Perceived reliability of the network | Worth 32% of the price | Singh et al., Transport Policy (2025) |
| Cars per charger in the literature | 135 on average | Xylia et al., Energy Strategy Rev (2025) |
| Actual current global average | 10 cars per charger | Xylia et al. (2025) |
What you will find here
• What the first charger in a municipality changes.
• Why installing slow chargers fails to drive registrations.
- What a working network is worth, translated into car price.
• The gap between the cars per charger that get planned and the real ones.
The effect of the first charger
Felix Schulz and Johannes Rode published in Energy Policy the study that isolates the moment a municipality goes from having no public point to having one. The material: annual, granular information on the location of public charging infrastructure and the battery electric car ownership rate across 356 Norwegian municipalities between 2009 and 2019, focused on the areas where the first public point was installed during that period. The result: in those mostly rural areas, the installation of a first public charging station started adoption, with an average rise in the local electric car ownership rate of 1.5 percentage points, equivalent to 200% over five years.
The robustness checks: the results hold against anticipation effects and do not change with different treatment thresholds, whether the municipality’s average number of public chargers over the period or the average density of public points per thousand inhabitants.
The caution the authors declare
Reverse causation is the underlying problem of this whole literature, and they name it: although they cannot entirely rule out reverse effects, they identify public charging infrastructure as a stimulus to the diffusion of the battery electric car.
The reverse effect is easy to picture: where electric cars already exist it is more profitable to install a charger, so the correlation can run both ways.
| Study | What it measured | What it found | What it cannot establish |
|---|---|---|---|
| Schulz and Rode (2021) | 356 Norwegian municipalities | The first charger starts adoption | Ruling out reverse causation |
| Illmann and Kluge (2020) | German postcodes | Positive but weak relationship | That chargers do not help |
| Van Dijk et al. (2022) | 422 Norwegian municipalities | More effect where there was no network | Very mature markets |
| Singh et al. (2025) | National survey, randomised information | Reliability worth 32% of price | Purchases: it measures intentions |
| Xylia et al. (2025) | 137 studies and 31 reports | 135 cars per charger on average | Which ratio is the right one |
Why adding chargers is not enough
Ulrike Illmann and Jan Kluge published in Transportation Research Part D the research that dissects which aspect of the infrastructure truly matters. The approach: a German dataset tracking monthly new car registrations by postcode from 2012 through 2017, cross-referenced with the official charging point registry, evaluating infrastructure based on its visibility, capacity, and density, utilizing an autoregressive distributed lag methodology enabling the identification of long-term structural ties. The overarching finding: data reveals a positive long-term correlation, though of a comparatively modest magnitude.
And the decomposition, which is the study’s contribution: the visibility effect, the mere existence of stations, and the capacity effect, the region’s accumulated charging capacity, are less effective than the abundance effect, that is, the average capacity in kilowatts per station.
What that means for whoever installs them
The authors’ interpretation is direct: consumers appear to be aware that public chargers suffer bottlenecks at peak hours and therefore appear to prefer a small number of fast chargers to a large number of slow ones.
The authors themselves position their work against the more optimistic studies: they argue that theirs is the methodologically most solid empirical analysis of the matter, because it deals with non-stationarity, cross-sectional dependence and possible heterogeneity, and that this is why their results are somewhat less optimistic than others.
The charger worth most is the first
Jeremy van Dijk, Nathan Delacrétaz and Bruno Lanz published in Environmental and Resource Economics the study that measures how the effect changes with the size of the existing network. The design: data from 2010 to 2017 covering markets from nascent to mature across 422 Norwegian municipalities, with two complementary identification strategies: control function regressions of electric car sales on flexible polynomials of the stock of stations and charging points, and synthetic control methods to quantify the impact of initial provision in municipalities that previously had none. The first result: elasticity estimates with respect to chargers increase with the stock of charging stations, suggesting that incremental installations are subject to increasing returns arising from network externalities.
And the second, which coexists with the first: the largest impact of incremental infrastructure occurs where there is hardly any prior network, consistent with diminishing marginal benefits as the network grows.
| Study | Country or scope | Size | Headline figure |
|---|---|---|---|
| Schulz and Rode (2021) | Norway | 356 municipalities, 2009-2019 | +1.5 points of ownership |
| Illmann and Kluge (2020) | Germany | Postcodes, 2012-2017 | Capacity per station rules |
| Van Dijk et al. (2022) | Norway | 422 municipalities, 2010-2017 | Diminishing returns |
| Singh et al. (2025) | United States | National survey | 366 miles of range equivalent |
| Xylia et al. (2025) | International review | 12,237 records screened | Median of 23 cars per charger |
The public policy implication
The conclusion the authors draw from that combination is specific: subsidising early infrastructure provision in small electric car markets can mitigate the associated inefficiencies and complement other instruments addressing transport externalities.
The problem that policy solves they describe as a chicken-and-egg dilemma: the benefit of buying an electric car depends on the size of the charging infrastructure, while station providers do not invest when the electric car fleet on the road is small.
A working network is worth 32% of the car’s price
Birendra Singh, Casey Quinn and Don MacKenzie published in Transport Policy the research evaluating the worth of reliability through a survey-based experimental design. The approach: leveraging nationwide survey data, a choice model is applied by them to measure how perceived charging dependability influences the purchase intent for pre-owned or brand-new electric vehicles, while randomly distributing details portraying public chargers as either exceptionally dependable or completely unreliable, thereby demonstrating a causal impact of reliability views. The outcome, expressed in two easily comprehensible metrics: variations in perceived dependability match a 32% shift in cost or 366 miles of driving range, highlighting just how crucial trustworthy public charging is.
The limit is worth naming: the study measures purchase intentions stated in a survey, not observed registrations.
How many cars per charger are really needed
Maria Xylia, Erik Olsson alongside co-researchers shared a systematic review within Energy Strategy Reviews comparing actual outcomes with projected planning. Their methodology involved screening 12,237 records while evaluating 137 peer-reviewed papers together with 31 grey literature reports released from 2017 through 2023. The uncovered discrepancy highlights that public charging demand reaches an average of 135 electric vehicles per charger alongside a median of 23, reflecting a considerably higher charger efficiency relative to the present worldwide public charging baseline of 10 cars per charger.
And the two reasons they give for that difference: the aggregation of charging strategies, because fast and ultra-fast charging can serve between five and ten times more vehicles per charger, and a very wide range of assumptions used across studies, which apparently deviate from actual deployment.
What to do with this, in practice
• Put the first charger where there are none. That is where Schulz and Rode (2021) and Van Dijk and colleagues (2022) find the largest effect.
• Measure kilowatts per point, not number of points. That is the dimension Illmann and Kluge (2020) find effective.
• Keep the network working before extending it. Perceived reliability is worth 32% of the car’s price.
• Distrust cars per charger as a target. The literature and actual deployment differ by a factor of more than ten.
• Do not carry figures from one country to another. Starting conditions, home charging first of all, change everything.
Frequently asked questions
Are public chargers needed for people to buy electric cars?
The initial one holds immense significance. According to Schulz and Rode in 2021, the debut public station within a Norwegian municipality boosted the local ownership rate by 1.5 percentage points, marking a 200% surge over a five-year span.
Is it worth installing more?
With diminishing returns. Van Dijk and colleagues, in 2022, find that the largest impact occurs where there is hardly any prior network.
What do purchasers of electric vehicles typically consider?
Speed, not quantity. Illmann and Kluge, in 2020, conclude that consumers prefer a small number of fast chargers to a large number of slow ones.
How much does it matter that the chargers work?
A great deal. Singh and colleagues, in 2025, find that the difference in perceived reliability is equivalent to a 32% change in purchase price or to 366 miles of range.
What is a reasonable number of vehicles per charging station?
It depends on the power. Xylia and colleagues’ 2025 review finds an average of 135 and a median of 23 cars per charger in the literature, against an actual global average of 10.
What we do not know
• How much of the correlation stems from reverse causation. The researchers themselves do not completely dismiss this possibility.
- Whether perceived reliability translates into purchases. The study measures stated intentions.
• Which cars per charger ratio should be planned for. The literature and reality differ widely.
- How all this carries over to countries without home charging. Starting conditions change the result.
References
1. Schulz, F. and Rode, J. Public charging infrastructure and electric vehicles in Norway. Energy Policy, 2021. DOI: 10.1016/j.enpol.2021.112660
2. Illmann, U. and Kluge, J. Public charging infrastructure and the market diffusion of electric vehicles. Transportation Research Part D: Transport and Environment, 2020. DOI: 10.1016/j.trd.2020.102413
3. Van Dijk, J., Delacrétaz, N. and Lanz, B. Technology adoption and early network infrastructure provision in the market for electric vehicles. Environmental and Resource Economics, 2022. DOI: 10.1007/s10640-022-00703-z
4. Singh, R. K. B., Quinn, C. W. and MacKenzie, D. Poor reliability of public charging stations can impede the growth of the electric vehicle market. Transport Policy, 2025. DOI: 10.1016/j.tranpol.2025.06.026
5. Xylia, M., Olsson, E. et al. Estimating charging infrastructure demand for electric vehicles: a systematic review. Energy Strategy Reviews, 2025. DOI: 10.1016/j.esr.2025.101753
This content is for information only and is not investment, energy or vehicle purchase advice. The studies cited measure different countries, periods, definitions of infrastructure and designs and are not comparable with each other, one of them measures stated survey intentions rather than real purchases, and none of them allows the effect of a particular rollout in another territory to be anticipated.